The Lab 01Procedure 02Inside 03Coverage 0XResults Request a Demo
Solvent · Permit Intelligence · Leviosa Labs
Compound 02 — Solvent — Permit Intelligence

Solvent dissolves the red tape — application prep, AHJ submission, status tracking, and auto-corrections. No more chasing paperwork or missing deadlines.

First-pass approval
96%
Turnaround
85% faster
Corrections
Answered in 4 min
Status
Dissolving

Permit Tracker

8 active · 96% first-pass
Martinez Home — Full Renovation
Hillsborough County, FL · filed 12d ago
Approved
Chen Residence — HVAC Install
Orange County, CA · filed 5d ago
In review
Park Property — Electrical
Miami-Dade County, FL · filed 2d ago
Submitted
Williams Roof Replacement
Broward County, FL · auto-corrected
Re-submitted
Auto-corrected a missing load calc on Williams Roof — re-submitted in 4 minutes
0
Faster permit turnaround
0
First-pass approval rate
0
AHJs mapped nationwide
0
Avg correction response
01 — The ProcedureScope → approval

From project scope to approved permit.

The entire permitting lifecycle, handled by AI. You focus on the work — Solvent handles the paperwork.

In
New project from CatalystMartinez Home · full renovation · Hillsborough County, FL
Auto
AHJ requirements identifiedHillsborough County requires: structural plans, electrical load calcs, site plan, license verification
8 min
Application package assembledAll 4 documents generated · compliance pre-checked · ready to submit
Step 01

Auto-detects requirements

Every jurisdiction has different rules. Solvent knows them all — the exact documents, forms, and calculations each AHJ requires. No more Googling county websites.

Step 02

Assembles & submits

Generates the application, attaches every supporting document, fills every form field, and submits — electronically where supported. Your team doesn’t touch a single form.

Step 03

Tracks & gets it approved

When the AHJ requests corrections, Solvent fixes and re-submits in minutes, not days. You get notified when it’s approved — not when there’s a problem.

02 — Inside the InstrumentReadings

Paperwork, dissolved.

Compliance pre-check

Zero issues before it ever leaves the building.

Solvent verifies every document against the county’s current code before submission — structural plans, load calculations, site plans, license status. 96% of packages pass on the first review.

  • Auto-filled forms, field by field
  • Live county code verification
  • E-filing where supported

Application Package — Hillsborough County

0 issues
Permit application formComplete · 23 fields auto-filled
Structural engineering plansVerified against county code
Electrical load calculationsNEC 2023 compliant
Site plan & contractor licenseGeo-verified & active
Pre-submission compliance check passed — ready to submit in 8 minutes
Auto-corrections

A correction request becomes a 4-minute fix.

When a reviewer asks for changes, most teams lose 3–7 days per round. Solvent generates the fix and re-submits automatically — usually before your coffee gets cold.

  • Real-time status monitoring
  • Fixes generated automatically
  • Notified on approvals, not problems

Permit #HBC-2026-04182

Total: 9 days (avg 28)
Day 1 · 2:14 PM

Application submitted — electronic filing to county portal

Day 5 · Correction requested

Missing load calculation for sub-panel. Solvent auto-generated & re-submitted in 4 minutes

Day 9 · 11:30 AM

Permit approved on second review — 19 days faster than county average

03 — AHJ CoverageLive map

Every jurisdiction. Every rule. Mapped.

Solvent maintains a live database of permitting requirements across 2,400+ Authorities Having Jurisdiction — and it's growing every week.

Interactive Coverage Map
Full coverage Expanding Coming soon
AHJs mapped
Permits filed
Avg approval
Coverage
0
AHJs mapped
0
States covered
0
First-pass approval
Weekly
New AHJs added
Need coverage in a specific jurisdiction? We add new AHJs weekly. Request coverage
04 — The ResultsControl vs. catalyzed

Stop losing money on paperwork.

Without Solvent
Time to prepare application3–5 hours
First-pass approval rate55–65%
Average time to approval21–35 days
Time lost to corrections3–7 days per round
With Solvent
Time to prepare applicationUnder 10 minutes
First-pass approval rate96%
Average time to approval5–10 days
Time lost to correctionsUnder 5 minutes
05 — Part of the OSBetter together

Amazing Alone.
Perfected Together.

Every compound in the Leviosai operating system makes the others smarter — one OS from first lead to finished job.

Ct Catalyst Sales Intelligence

Closed deals flow downstream automatically — scope, pricing, and customer data with zero re-entry.

Bd Bond AI-Native CRM

Every milestone is logged to one living customer timeline — no one ever asks "what’s the status?"

Rc Reactor Operations Intelligence

Crews get dispatched the day the permit clears — schedules re-optimize the moment anything changes.

Limited early access · 30-min walkthrough · No commitment

Never chase a permit again.

We’ll walk through your actual AHJs and show you the process live. 30 minutes, no pressure.